Mississauga & the GTA

Drywall hung level. Taped tight. Sanded smooth.

From a single room reno to a full basement build-out, VO Build Corp installs drywall the way it's supposed to be installed — sheets level, fasteners countersunk, joints tight, and mud sanded glass-smooth before paint touches it.

What we do

The full scope.

check_circle

Full-room drywall

New construction, additions, complete renos. 1/2" or 5/8" as the room calls for.

check_circle

Basement finishing

Vapor barrier, framing checks, drywall hung and finished. Ready for paint.

check_circle

Ceiling drywall

Including replacement after water damage or popcorn removal.

check_circle

Soundproof & moisture-resistant boards

Where it matters: bathrooms (green board), shared walls (sound-rated), garages (Type X).

check_circle

Tape, mud & sand to Level 5

Skim-coat finish for spaces where lighting is unforgiving.

Our drywall install process

Four steps. No surprises.

Site visit

Measure, check framing, identify any electrical or insulation that needs to go in first.

Hang

Sheets cut, fitted, fastened. Joints staggered, gaps tight.

Tape & mud

Three coats minimum on tapered joints, sanded between.

Final sand

We hit it with a light to catch every imperfection before walking away.

What's included

The standard, every job.

  • check_circleFraming inspected before we hang
  • check_circleSheets staggered for strength, gaps minimized
  • check_circleFasteners countersunk, no screw pops
  • check_circleThree coats of mud, sanded smooth
  • check_circleDust managed — sheet plastic up, vacuum after
Recent drywall work

From the truck this month.

See more in the gallery arrow_forward

Drywall job ahead? Let's scope it.

We quote drywall in writing, free. From small additions to full basement finishes.